Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("Boca pozo submarina")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 479

  • Page / 20
Export

Selection :

  • and

Plugging of a downhole control lineIVERSEN, M; EGE, J.A.32nd Annual Offshore Technology Conference. Construction and Installation/Field Drilling and Development Systems. 2000, pp 161-167Conference Paper

Intervention-free completion suspension and installation West of ShetlandELLIOT, G; MAKIN, G.D; FERGUSON, S.E et al.Construction and Installation/Field Drilling and Development Systems, 31st Annual Offshore Technology Conference. 1999, pp 639-648Conference Paper

Device installs silos to project subsea wellsOcean industry. 1989, Vol 24, Num 6, issn 0029-8026, 36Article

Q4000 banking on intervention work to replace full-size drilling rigsFURLOW, W.Offshore (Conroe, Tex.). 2001, Vol 61, Num 1, pp 66-105, issn 0030-0608Article

Modular movement for subsea systemsBRADBURY, F. John.Hart's E & P. 2004, Vol 77, Num 2, pp 64-65, issn 1527-4063, 2 p.Article

Setting the standardVON FLATERN, R.Offshore Engineer. 2002, pp 36-41, Janvier 2002Article

Subgea completions: the positive trend continuesMOHR, H. O.World oil. 1995, Vol 216, Num 2, pp 84-88, issn 0043-8790Article

Remote control optimizes productionRASHEED, W.Hart's E & P. 2002, Vol 75, Num 7, pp 61-62, issn 1527-4063Article

Deepwater testing center proposed off French RivieraOil & gas journal. 2002, Vol 100, Num 36, pp 25-26, issn 0030-1388, 2 p.Article

Midwater processing pipe bundle reduces deep flow assurance riskOffshore (Conroe, Tex.). 2001, Vol 61, Num 9, pp 48-166, issn 0030-0608Article

Production starts on Gulf of Mexico's newest TLPOil & gas journal. 2001, Vol 99, Num 37, pp 66-67, issn 0030-1388Article

Trials at Troll CSNIECKUS, D.V.Oil & gas journal. 2001, Vol 99, Num 26, issn 0030-1388, p. 38Article

Balancing actTHOMAS, M.Hart's E & P. 2000, Vol 73, Num 3, pp 58-63, issn 1527-4063Article

Survey, intervention UUVs : Where is technology headed ?HASAN, S.M.Offshore (Conroe, Tex.). 2000, Vol 60, Num 12, issn 0030-0608, p. 40Article

Design, testing and installation of the Gemini umbilicalNORRIS, P.E.32nd Annual Offshore Technology Conference. Construction and Installation/Field Drilling and Development Systems. 2000, pp 51-56Conference Paper

The Asgard field: Norway's biggest offshore challenge to dateTORSOY, T.Proceedings of the Sixteenth World Petroleum Congress. 2000, pp 301-303, isbn 085293-293-6Conference Paper

Fiberoptics speed controls, data on ultra-deepwater drilling multiplexFURLOW, W.Offshore (Conroe, Tex.). 2000, Vol 60, Num 02, pp 74-75, issn 0030-0608Article

Subsea solutionsCHRISTIE, A; KISHINO, A; CROMB, J et al.Oilfield review. 1999, Vol 11, Num 4, pp 2-19, issn 0923-1730Article

New technology moves industry into ever deeper waterKHALIL, C.N.World oil. 1996, Vol 217, Num 07, pp 39-50, issn 0043-8790, 9 p.Article

Pushing the limits of a subsea wellhead system's 8.4 MM Cb. compressive and 17.5 KSI internal pressure capacity with all-metal sealsRADI, A; LANDRIAULT, S.Geology, Earth Sciences and Environmental Factors 1995 Offshore Technology Conference. 1995, pp 319-327Conference Paper

The Statfjord satellites: challenges and experiences during development and production start upMALMIN, C.Geology, Earth Sciences and Environmental Factors 1995 Offshore Technology Conference. 1995, pp 467-475Conference Paper

The spool tree: first application of a new subsea willhead tree configurationLOPEZ, R.H; MANSELL, M; STEWART, A.A et al.Platform and marine system design 1994 Offshore Technology Conference. 1994, pp 65-76Conference Paper

Piled tool will level subsea well template for Heidrun TLPOil & gas journal. 1992, Vol 90, Num 2, pp 44-45, issn 0030-1388Article

Stacked subsea templates accelerate deepwater developmentRAMSEY, J.F; BLINCOW, R.M; PICKARD, R.D et al.Oil & gas journal. 1991, Vol 42, pp 69-72, issn 0030-1388Article

Structural requirements for the effective transfer of environmental loadings in a subsea wellhead systemMILBERGER, L. J; YU, A; HOSIE, S et al.1991 Offshore Technology Conference. 1991, vol. 4, 103-113Conference Paper

  • Page / 20